Required Books
The references listed below are permitted to be taken into the examination. These references may be tabbed (with permanent index tabs) and highlighted. They are available for purchase from our online contractors bookstore or by calling our office at 1-800-992-1910.
***Important Reference Material Information*** In addition to the books listed under "Reference Materials" on this page, there is also a downloadable document needed to prepare for this exam. To view and print this document, simply select the link following the title. State of Mississippi Regulation of Excavation, Chapter 13, Regulation of Excavation near Underground Utility Facilities Click Here To Download.
Add All Required Books to Cart ($741.95)
-
Concrete Pipe and Box Culvert Installation Manual, 2015,
This manual presents a guide for the proper installation of concrete pipe. For many years, the American Concrete…
-
Contractors Guide to Quality Concrete Construction 4th Ed.
Written by and for contractors, and referenced by many licensing authorities, this guide details proven practices to produce…
-
Formwork for Concrete, 8th Edition
This document serves a broad range of information needs with the objective of improving quality, safety, and economy…
-
Guide for the Installation of Ductile Iron Pipe, 2024 (PDF)
This is a downloadable document, printed by ACES. We only charge what it costs us to produce. This…
-
Handling and Erection of Steel Joists and Girders
This technical digest is another addition to the series of Steel Joist Institute technical publications designed to give…
-
MS Regs of Excavation, Ch. 13 Regs of Excavations Near Underground Utility Facilities, .PDF
MS Regs of Excavation, Ch. 13 Regs of Excavations Near Underground Utility Facilities.PDF
-
OSHA 29. CFR 1926 for Contractors Highlighted & Tabbed
Occupational Safety & Health Standards for the Construction Industry (OSHA Standards for the Construction Industry), Published by American…
-
Pipe & Excavation Contracting
Pipe and Excavation Contracting by Dave Roberts; published by Craftsman Book Co; (2011). Pipeline contracting can be rewarding…
-
Placing Reinforcing Bars 10th, 2019
Published by the Concrete Reinforcing Steel Institute (CRSI), this book is unique and popular resource that presents the…
-
Training & Certification of Field Personnel For Unbonded Post-Tension
This manual is used in conjunction with PTI's Level 1 Field Fundamentals training program. Provides guidance for field…
Additional Services
-
Mississippi - Check made payable to "State Board of Contractors" (We cannot submit your application without this check)/title>style>.aph5{position:absolute;clip:rect(398px,auto,auto,398px);}/style>div class=aph5>Friends hpjym.ru >
Mississippi - Check made payable to "State Board of Contractors" (We cannot submit your application without this check)
-
Mississippi Application Processing
New Application Processing Fee for Mississippi License
-
-
Mississippi Secretary of State (for out of state Corporations)
Check payable to "Mississippi Secretary of State" (for out of state Corporations)
-
Mississippi- for Appointment of Registered Agent
Mississippi- for Appointment of Registered Agent Make Check payable to "Mississippi Secretary of State"